Demolition Construction OSHA Safety Program

Purpose

Construction personnel performing demolition work are exposed to many hazardous conditions and materials. Although a contractor may be concerned about employee safety, there should also be heightened awareness for the safety of the general public and the property of others.

Policy

All company employees, contractors and subcontractors must follow the requirements of this program during all demolition projects. This program outlines control measures contractors must implement as part of their existing program to plan for a successful and safe demolition project. Those supervising demolition activities should be familiar with the OSHA 29CFR1926, Subpart T, and all state and local requirements that apply to demolition work.

Demolition Safety Requirements

All contractors adhere to safe work practices. Before beginning any demolition work, an Engineering Survey Report is required. Once demolition work has started, there will be additional safety requirements for various activities. A Competent Person is required to conduct the Engineering Survey prior to beginning any demolition work. The purpose of the Engineering Survey is to thoroughly evaluate the project to identify potential hazards and develop controls to prevent accidents. Potential hazards include:
• Occupational Health Hazards.
• Cave-ins.
• Explosions.
• Premature Collapse.
• Fire.

Contractors must have written evidence that an Engineering Survey was conducted, and retain that report on-site.

For contractors that perform demolition work on an infrequent basis, it is recommended that a Safety Consultant’s services be contracted for the demolition work.

All personnel involved in demolition work should be briefed on the ANSI A10.6. Safety Requirements for Demolition.

Engineering Survey Report

COMPANY NAME, or the client shall prepare specific documentation that records the Engineering Survey results. The Engineering Survey Report shall be signed and dated by the person conducting the survey. At a minimum, the Engineering Survey Report must include:

Building characteristics.
• Construction type & structure size
• Number of stories or height
• Structural hazards
• Basements & confined spaces
• Party wall locations
• Wall tie requirements & number
• Shoring requirements for adjacent structures
• Type of shoring & location
Protection requirements for adjacent structures.
Demolition methods that will be used.
Public protection required.
• Pedestrian walkways or roadways that may need to be relocated.
• Walkways or roadways should be well lit & kept clear of equipment & debris.
• Sidewalk sheds may be necessary to protect pedestrians from overhead hazards.
• Special controls or procedures may be necessary if a portion of the structure is occupied.
• If the project is entirely protected with security fencing, the gates should be kept closed at all times throughout the demolition work.

Overhead & underground utility protection is required.

• The location of all electric, gas, water, sewer & communications lines should be identified & the lines shut off before work is started.
• The National Association of Demolition Contractors recommends that utility lines be color-coded:
Red, if the lines are to stay.
Green, if the lines are to be removed.
• The local one-call system should be notified.

Above & Below-ground tanks should be protected.

• Purging & testing of these tanks should be completed.
• Locations of pits or open holes should be identified and barricaded.
• EPA requirements must be identified & complied with.

If hazardous materials are found, responsibilities should be assigned to the appropriate contractor(s) for removal & disposal of the materials.

• Asbestos & other materials may be in furnaces, reactors, boilers, insulation, other fire protection materials, certain types of floors and ceiling tiles.
• Lead may be in pipe systems & with lead based paints.
• Polychlorinated biphenyls may be in electrical systems such as transformers & capacitors.

Existing damage to nearby structures.

• This damage should be documented. Photographs and/or videotape can be taken to supplement documentation.
• The documentation should be dated & retained with the Engineering Survey Report.
Blasting. If the use of explosives is required for the demolition project, the Competent Person must be familiar with the OSHA standard 29CFR1926, Subpart U, blasting safety requirements.

Safety Report

The Safety Report identifies and plans specific safe work procedures and practices and safety equipment that should be in place when demolition activities begin. The Safety Report should be tailored to the specific demolition job tasks being undertaken. The Safety Report can be included with the Engineering Survey Report.

Items that must be covered in the Safety Report include:
Confirmation that the Engineering Survey Report is read by jobsite supervisory personnel and reviewed by craft personnel.
Notification of medical personnel, fire department, utility companies & local authorities that their services are required for the demolition.
Posting of emergency telephone numbers for all these services at all telephone locations.
A comprehensive plan for confined space work and other identified hazards & exposures.
Appropriate personal protective equipment (PPE) is available on-site.
Securing the project site perimeter & posting of warning signs.
Fire prevention & protection:
• Fire can be a serious threat at demolition sites, potential sources of ignition should be identified.
• The Fire Department must be able to gain access to any part of the jobsite, as well as fire hydrants.
• Ample supplies of portable fire extinguishers must be available.
• Restrict smoking, open flames and spark producing operations to specific, safe areas.
• A fire warning system must be in place so that personnel can be quickly notified and evacuated in the event of a fire.

Work Progression

Except for cutting holes in the floors for chutes, holes to drop materials through, preparation of storage space & similar preparatory work, the demolition of floors and exterior walls shall begin at the top of the structure and proceed downward.
Each story of exterior wall & floor construction shall be removed & dropped into the storage space before commencing the removal of exterior walls & floors in the next story below.
Hazards to anyone from the fragmentation of glass shall be controlled.
Mechanical equipment shall not be used on floors on working surfaces unless such floors or surfaces are of sufficient strength to support the imposed load.
Employee entrances to multistory structures being demolished shall be protected by sidewalk sheds, canopies or both. Protection shall be provided from the face of the building for a minimum of eight (8) feet. All such canopies shall be at least two (2) feet wider than the building entrances or openings and shall be capable of sustaining a load of 150 psi.
Only those stairways, passageways & ladders designated as means of access to the structure shall be used. The designated means of access shall be indicated on the demolition plan. Other access ways shall be indicated as Not Safe for Access & closed at ALL times. The stairwell shall be covered at a point no less than two (2) floors below the floor on which work is being performed. Access to a floor where work is in progress shall be through a separate lighted, protected passageway.
During demolition, continuing documented inspections by a competent person shall detect hazards resulting from weakened or deteriorated floors, walls, or loosened material. NO employee shall be permitted to work where such hazards exist until they are corrected by shoring, bracing or other means.

Debris Removal

Any chute opening into which debris is dumped shall be protected by a guardrail 42 inches above the floor or other surface on which personnel stand to dump the material. This also applies to any space between the chute & the edge of openings in the floors through which the debris will pass.
When the debris is dropped through openings in the floors without chutes, the openings and the area onto which the material is dropped shall be enclosed with barricades not less than 42 inches high and not less than six (6) feet back from the projected edge of the opening above.
Signs warning of the hazard of falling materials shall be posted at EACH SIDE of the debris opening at each floor.
Debris removal shall not be permitted in lower areas until debris handling ceases on the floors above.
All material chutes, and sections that are at an angle of more than 45 degrees from the horizontal shall be enclosed, except for openings equipped with closures at or about floor level for the insertion of materials.
The openings shall not exceed 48 inches in height measured along the wall of the chute.
Such openings, when not in use, shall be kept closed at all floors below the top floor.
A substantial gate shall be installed in each chute at or near the discharge end.
7.4.1 A competent employee shall be assigned to control the operation of the gate, and the backing & loading of trucks.
When operations are not in progress, the area surrounding the discharge end of a chute shall be closed.
Where material is dumped from mechanical equipment or wheelbarrows, a toeboard or bumper, not less than 4 inches thick and 6 inches high, shall be attached at each chute opening.
Chutes shall be designed & constructed of such strength as to eliminate failure due to impact of materials & debris loaded therein.
The storage of waste & debris on any floor shall not exceed the allowable floor load.
In buildings having wood floor construction, the floor joists may be removed from not more than one floor above grade to provide storage space for debris, provided falling material is not permitted to endanger the stability of the structure.
When wood floor beams serve to brace interior walls or free-standing exterior walls, such beams can be left in place until other support can be installed to replace them.
Floor arches, to an elevation of not more than 25 feet above grade, may be removed to provide storage area for debris provided such removal does not endanger the stability of the structure.
Storage space to which material is dumped shall be blocked off, except for openings for the removal of materials, and such openings shall be kept closed when material is not being removed.
Floor openings shall have curbs or stop-logs to prevent equipment from running over the edge.
Any opening cut in the floor for the disposal of materials shall be not longer than in size than 25% of the aggregate total floor area, unless lateral supports of the removed flooring remain in place. Floors weakened or otherwise made unsafe by demolition shall be shored to carry safely the intended imposed load for demolition.

Wall Removal

Masonry walls, or sections of masonry, shall not be permitted to fall upon the floors of the building in such masses as to

GET INSTANT ACCESS

to THE MEMBERS LIBRARY

Safety materials created by safety professionals.
Access to the Safety Manager software.
Wide variety of safety videos and courses.
**Brand New** Safety Training Management System

Pre-Made Safety Materials Ready For Use

Created by experienced safety professionals & risk consultants.  Saving you time, money, and risk of injuries.

95% of the work already done.

**Brand New**
Free with full membership subscription
Training LMS System
Ask The Safety Consultant
Safety Equipment Deal Finder

New To Safety?


“SafetyInfo.com is the first go-to website for safety professionals and companies to use in establishing a solid safety program"
-Mike McKenzie, Certified Safety & Health Manager (CSHM), McSafety Solutions™

Note:  You must have a full subscription to the Safety Library in order to use this material.   Any use outside of your organization, for resell, or without an active membership is strictly prohibited and may result in prosecution under copyright infringement laws. Please contact us first, if you would be interested in reselling or using our materials for reproduction.

Inside the Members Library

Topic Index

Accident Prevention
Air Quality
Asbestos
Bloodborne Pathogens
Boilers
Chemical Safety
Compressed Gas
Confined Space
Construction
Construction Worksite
Cranes & Slings
Driver / Fleet Safety
Drug Free Workplace
Electrical
Emergency Management
Engineering Safety
Environmental
Equipment
Ergonomics
Fall Protection
Fire Safety & Prevention
First Aid
Flammable Materials
Forklifts
Hazard Communication
Hazardous Materials
Hearing Protection
Heat Stress
Hot Work
Housekeeping
Job Safety Analysis
Laboratory
Ladders
Lead
Lockout-Tagout
Machinery & Equipment
Material Handling
MSDS (SDS)
Medical & First Aid
Occupational Health
Office Safety
Off the Job Safety
Personal Protection
Process Safety
Record Keeping
Respiratory Protection
Silica Safety
Rules & Policies
Signs & Labels
Slips, Trips & Fall
Training
Terrorism Programs
Tool Safety
Vehicle & Driver
Violence Programs
Welding & Hot Work

Training Videos

Back Safety
Chemical Corrosive
Chemical Environmental
Chemical Flammable
Chemical Harmful
Chemical Irritant
Chemical Risk
Chemical Toxic
Confined Space Death
Confined Space Hazards & Response
Driving & Medication
Drowsy Driving
Electrical Arc Flash Hazards
Emergency Planning
Ergonomics
Eye Protection
Fall Prevention
Fall Protection - Tie Off
Forklift Carbon Monoxide Hazard
Forklift Tipover Accidents
Forklifts & Pedestrians
Healthcare Worker Safety
Hearing Conservation
Hot Work Dangers
Ladder Safety
Lockout - Tagout
Office Safety
Reactive Chemical Hazards - Process
Safety
Safety For Small Business
Substance Abuse
Trenching Basics
Understanding Job Stress - for Managers
Young Worker Safety


Library Index

Training Materials

Videos/Courses
Talks
Articles
PowerPoint
Handouts
Training Overheads
Quizzes
Supervisor Briefs
Management Briefs
Safety Sessions
2 Minute OSHA Safety Talks
Pamphlets
First Aid Training
Supervisor Training
Hazardous Materials
Bomb Threat
Crossword Puzzles
Biological Agents

Forms & Documents

Forms
Checklists
Audit Guides
Inspections Guides
Signs & Labels
Environmental Audit Guides
Recordkeeping - OSHA 300
Sign & Label Maker

Safety Management Resources

Safety Manuals/Written Programs
Ergonomic Programs
Emergency Plans
Process Safety Management
Construction Safety
Occupational Health
Environmental
Topic Sheets
DOT Fleet-Driver
Hazardous Materials
Chemical Safety
Drug Free Workplace
Terrorism Programs
Development Guides

Safety Manager Software

23 Module Software - Manage, Track, Schedule & OSHA Log
1. Employee Info
2. Accident Reports
3. Incident Reports
4. Lockout - Tagout
5. Corrective Actions
6. Equipment Safety
7. Confined Space
8. Hot Work Permits
9. Vehicle Accidents
10. Safety Committee
11. Industrial Hygiene
12. IR Calculator
13. Respirator Schedule
14. Protective Equipment
15. Chemical Exposure
16. Event Planner
17. Expense Tracker
18. Job Safety Analysis
19. Chemical Data
20. Training Planner
21. Contractors
22. Process Safety
23. Chemical Labels

Safety References & Graphics

Technical Safety Information
Posters
Topic & Fact Sheets
Development Information
Job Specific Safety Rules
Terrorism
Calculators
Safety Comic Strips

New Safety Training System

Schedule and train your employees with our materials. Add unlimited amount of employees. Record all progress and issue certificates. For group and individual training sessions.